Over the years our team has built everything from ADNOC, ENOC and Emarat filling stations to warehouses in Jebel Ali and heavy silos for cement plants in the UAE and overseas. On a bill of quantities it all falls under "structural steel", yet the day-to-day reality of building each one could hardly be more different.

Filling stations: repeatable details and tight site windows

Fuel retail brands have strict architectural standards, so once the design details are approved, much of the canopy and service-building steel repeats cleanly from one station to the next. We have designed, supplied and installed station steel for ENOC and Emarat, seven ADNOC stations in Abu Dhabi, and ADNOC sites across Sharjah, Ras Al Khaimah and Umm Al Quwain.

Where filling stations really test a contractor is on site. Access is tight, civil trades are working around you, and opening dates rarely move. Every beam and column needs to arrive coated, numbered and ready to bolt straight up without field cutting.

Warehouses, workshops and factory extensions

With industrial buildings, the big questions are clear spans, overhead crane loads and whether the owner might extend the building five years from now. If a workshop is going to carry a 5-tonne or 10-tonne gantry crane, the corbels and runway beams have to be detailed for it from day one.

We have built container terminal maintenance buildings in Jebel Ali, a yacht building shed at Dubai Maritime City, and factory extensions for Arabian Oasis and Al Shirawi. On extensions especially, a proper tape-measure survey of the existing building before cutting a single bar saves days of grief on site.

Cement plants: heavy plate, vibration and export packing

Cement plant steel is a different beast altogether. Galleries, clinker and raw meal silos, kiln silos, grate cooler hoppers, bag filter casings and transfer chutes deal with heat, heavy dust loads and constant vibration. Plate fit-up and weld continuity matter far more than on a standard portal frame.

We have fabricated this work for Al Bana Cement and JK Cement here in the UAE, as well as large packages for Intercem — including 450 tonnes for the Sitarail plant and projects shipped to Kampala and Côte d’Ivoire. When steel is travelling thousands of kilometres in containers, trial-fitting key joints in our yard first is worth every hour.