Building a brand-new warehouse on a clear plot is straightforward. Extending a working factory, adding a mezzanine, or modifying an existing facility — like the extensions we have delivered for Arabian Oasis in DIP, Al Shirawi Equipment, or the DTC headquarters modifications — is where experience really pays off.
When your production lines or loading bays have to keep moving while steel goes up next door, planning the tie-in matters just as much as fabricating the steel itself.
Measure the real building, not just the old drawings
Original as-built drawings from ten or fifteen years ago are a useful starting point, though they almost never tell the whole story. Over the years, people add cable trays, chilled-water pipes, roller shutters and small lean-tos that never made it onto paper, and existing columns are rarely plumb to the last millimetre.
Before we detail connection plates or cut steel, our engineers survey the actual tie-in points, roof eave heights and foundation levels on site. Two hours with a laser and tape prevents two days of burning and re-drilling while a mobile crane sits on standby.
Use bolted connections wherever you can
Welding overhead inside or next to an operating factory means hot-work permits, fire watches, clearing stock out of the way and protecting finished equipment from sparks. Designing the new steel to bolt cleanly onto existing columns or onto new independent columns right beside them keeps site welding to a minimum and speeds up erection.
Plan deliveries around the client’s working day
Busy industrial parks do not have acres of laydown space. We sequence fabrication in our yard to match the exact order the erection crew needs it — bay by bay — so steel comes straight off the trailer onto the hook. That keeps access lanes clear for your trucks and cuts the time your site is disrupted.




